What are the differences between Scrum and Kanban?

Difference between Scrum and Kanban:

                    Scrum:                                                                                           Kanban:


1) Defines the role of each member in the team.    |   No Role assigned to individuals.

2) Follows the iterative methods                            |    Does not follow the iterative method.

3) To solve problems, it breaks into tasks and        |   Does not make a problem into sub-problems.

       try to solve it.  

4) Scrum track the progress as Sprint                    |   In Kanban track cards are used to track the progress,

5)If team member leaves between the sprint         |   If a team member leaves the flow of work get affect.

      the process does not get disturbed.                                               

6) Scrum is a cross-functional                                |   Specialized team are important.

7)  Suitable for project that changes the priority    |   Unlikely to change over, suitable for stable project.

     often.